Skip to content

Survey - Phase 2

The purpose of this phase of the project is to develop a PTH 1E Conceptual Design Study for twinning the 16-kilometre section of the Trans-Canada Highway from 5.0km west of PR 301 to the Ontario Boundary. At this stage in the project, we are specifically looking at potential corridors of land that could accommodate a future highway twinning, and that would connect with the work already being undertaken by Ontario on their side of the Manitoba-Ontario boundary.

If you are already signed in, please refresh this page